Case study: Production optimization
Add Energy’s flow assurance experts were tasked with de-bottlenecking flow restrictions of unstable production wells to maximize and maintain production rates.
Through transient simulations, Add Energy was able to offer short and long term solutions to stabilize productions, increase flow rates and exceed initial production rate targets. The operator is now producing to the initial delivery plan, using gas lift techniques designed by Add Energy.
Read more about this project