Project showcase

Asset register and maintenance build for new waste to energy facility

Project goal

To develop a full asset register and maintenance build in the client’s CMMS and perform a criticality study to allow the new facility to efficiently begin energy production

Client:

Energy supplier

Asset:

Energy from waste facility

Location:

UK

Why we were contracted

Add Energy’s maintenance team was recently contracted by a new build waste to energy plant to develop their asset register and maintenance build.

We were selected to deliver this CMMS build because:

  • A lack of in-house capability triggered the requirement for external support with this project
  • Add Energy had an already established relationship in place with this client
  • We had extensive experience working on similar projects
  • We were familiar with the client’s CMMS system, plant layout, and equipment types
Why we were contracted

Add Energy completed this project in three key stages:

Desktop Asset Verification

Desktop Asset Verification

Development of a comprehensive asset register through desktop asset verification (DAV) of the engineering drawings and documentation. Equipment types were assigned to the functional locations

Criticality Study

Criticality Study

An equipment criticality assessment was performed and the correct criticalities were assigned to the equipment in the asset register following ISO 14224 standards

Maintenance Build

Maintenance Build

Add Energy’s Maintenance Strategies were used to apply maintenance to applicable equipment


Project benefits

Asset register

Asset register

All maintainable equipment is now visible in the asset register with the right equipment type assigned. Having up to date and accurate asset register data will provide the means to manage and maintain equipment efficiently and effectively

CMMS upload templates

CMMS upload templates

Asset register, including criticality assignment, and maintenance templates were delivered to the client in populated CMMS load templates. This ensured that delivery and load to clients CMMS went smoothly

Efficient maintenance planning

Efficient maintenance planning

Up to 4000 equipment tags were reviewed and validated with the P&ID to ensure they were maintainable pieces of equipment. Appropriate maintenance strategies were applied with optimum frequencies to ensure maximum operating time

Safety critical equipment is identified in the CMMS

Safety critical equipment is identified in the CMMS

SCE’s were classified to ensure legislative compliance and alignment to the safety case/performance standards. This also allows risks associated with failure, deterioration or incident to be managed efficiently and proactively

Cost and efficiency savings

Cost and efficiency savings

With the appropriate maintenance assigned at the optimum frequency and priority, maintenance resources are better utilized. Accurate, standardized and consistent foundation data will enable future analysis, review and optimization to be conducted at an efficient cost

Learn more about our Master Data Build, Management and Optimization Solutions

Learn more

Register your interest in CMMS Data Building solutions


By registering your interest, you can:

  • Speak to one of our experts to learn more about our master data solutions
  • Request a quotation
  • Receive ongoing insights and advice around CMMS data best practice and cost saving initiatives
  • Learn more about our CMMS build software